Aldrich & Lambrechts report

Table 4

Southwest Corridor Project

Elevation of
Bottom of Structure
Elevation of
Bottom of
Deepest Excavation
Lateral Earth
Support System

Type of Foundation

SubwayAmtrak


Gainsborough Street6.03.33.6None, excavation slopedBelled caissons bearing on clay crust
Massachusetts Avenue6.0-6.0-7.5Steel sheet pilingRectangular pedestals bearing on clay crust
Blackwood Street-8.2-14.4-23.0*Concrete diaphragm wallSlab on compacted gravel borrow
replacement fill
West Newton Street-10.4-16.7-24.5*Concrete diaphragm wallSlab on compacted gravel borrow
replacement fill
Harcourt Street-10.4-16.4-24.5*Concrete diaphragm wallSlab on compacted gravel borrow
replacement fill
Yarmouth Street-4.7-12.4-14.4
-18.4**
Steel sheet pilingPrecast-prestressed concrete piles
to glacial till/bedrock
Dartmouth Street3.6-4.0-5.6
-12.4**
Soldier piles & lagging
to south (Amtrak) side.
None to north side.
Precast-prestressed concrete piles
to glacial till/bedrock
Clarendon Street3.6-5.0-6.4
-9.6**
Soldier piles & lagging
to south side. None to
north side.
Precast-prestressed concrete piles
to glacial till/bedrock
Berkeley Street1.6-5.0-6.4
-8.4**
Soldier piles & lagging
to south side. None to
north side.
Precast-prestressed concrete piles
to glacial till/bedrock
Chandler Street
(to east end)
-2.1-3.0-4.4Soldier piles & lagging
to south side. None to
north side.
Precast-prestressed concrete piles
to glacial till/bedrock

Notes: Information was obtained from 1981 and 1982 Massachusetts Bay Transportation Authority construction plans for Contracts No. 097-115 and 097-120.

*Removed organic silt to top of clay stratum.

**Lower elevation for trench excavated for track drain pipe.