Hello everyone. The following summarizes our work from 30 August Š 7 September 2004.
- Worked on obtaining PIC permits and building permit for the next group of 105 observation wells to be installed in the fall/winter 2004.
- Obtained a building permit for the next 105 observation wells in the fall/winter 2004.
- Continued work on PIC for the EPA program of wells to be installed in the fall/winter 2004.
- Worked with co-op Jacob Leahey on organizing Building Inspector Reports (BIRÕs) data for posting on the web-site.
- Examined alternate solutions for groundwater recharge.