GROUNDWATER OBSERVATION WELL PERMITTING

A Licensee planning to install Monitoring Wells must file an application with the city's Public Improvements Commission (PIC).

The Groundwater Trust will review the application of the Licensee and determine if the wells installed will be turned over for control to them at the end of the license use. Below are links that provide some assistance in preparing these documents.

Monitoring Well Checklist

Monitoring Wells Reversion to The Boston Groundwater Trust Form (DOWNLOAD)

CITY OF BOSTON RULES AND SPECIFICATIONS FOR CONTRACTORS

The Boston Groundwater Trust (BGwT) collaborates closely with the City of Boston, and the Construction Inspection Unit (CIU), to ensure that all observation wells are carefully preserved during the entire process of sidewalk reconstruction. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT OBSERVATION WELLS ARE PRESERVED THROUGHOUT THE WORK BEING PERFORMED. PLEASE REFER TO THE IMAGES PROVIDED BELOW AND DO NOT HESITATE TO CONTACT THE BOSTON GROUNDWATER TRUST (BGwT) WITH ANY QUESTIONS OR INQUIRIES YOU MAY HAVE.